SR 159 Road Rehabilitation

SR 159 Road Rehabilitation

RQAW was selected to design this minor structural overlay. Originally the scope of the project included a substantial amount of widening. When we received the project, RQAW immediately performed a preliminary cost estimate to ensure the project budget would...

read more
SR 234 HMA Overlay

SR 234 HMA Overlay

This partial 3R, minor structural overlay project located in Montgomery County was 11 miles in length and extended through the Town of Ladoga. The cross-section of the roadway remained unchanged, except at locations where two-ft shoulders were added within the...

read more
Old Meridian and Carmel Dr./Pennsylvania Ave.

Old Meridian and Carmel Dr./Pennsylvania Ave.

The project included full-depth QC/QA HMA pavement construction, small structure installations, extensive utility coordination, and ADA concrete curb ramps. Project responsibilities included significant coordination with local businesses. The $1.2M project was...

read more
Arlington Ave

Arlington Ave

The Indianapolis Department of Public Works hired RQAW to repair a section of Arlington Avenue. This was an emergency repair project with a 6-week design, contract preparation, bid, and construction complete timeline.

read more
SR 39 ADA Curb Ramps and Sidewalks

SR 39 ADA Curb Ramps and Sidewalks

RQAW was chosen to upgrade 32 curb ramps along SR 39 from Reagan Street to the north limit in the Town of Clayton. The project goal was to make all ramps ADA compliant; however, our team was able to utilize several innovative solutions throughout the design process....

read more
Carmel Drive and City Center Roundabout

Carmel Drive and City Center Roundabout

The intersection of Carmel Drive and City Center Drive was a locally funded roundabout project in the City of Carmel. The right-of-way surrounding the site created several complications, so RQAW had to determine the best location to place the roundabout that would...